Menu

AUD
TAMIYA MINI COOPER RACING (MB-01) Chassis 1/10 KIT NO ESC INCLUDED REQUIRES TX, RX, ESC, BATTERY CHARGER & PAINT
TAMIYA

TAMIYA MINI COOPER RACING (MB-01) Chassis 1/10 KIT NO ESC INCLUDED REQUIRES TX, RX, ESC, BATTERY CHARGER & PAINT

$239.00 Incl. tax
Out of stock
  • Brick & Mortar Store
  • Quick & Secure Shipping
  • Lots of New Old stock
  • Proudly WA owned

Product description

Mini Coopers have been automotive machine fan favourites for decades! This 1/10 scale radio control model kit recreates the version of the Mini Cooper built by the British Motor Corporation (BMC) as it existed between 1959 and 2000. Original Minis were built for four decades without model changes. It had a front-wheel drive layout which was rare at that time, and it featured compact mechanics...

This radio-controlled car model offers you all the authentic charm of a small sports car, thanks to its polycarbonate body and its MB-01 short wheelbase chassis, guaranteeing maneuverability and realism.

Assemble this RC model gem yourself and relive the epic journey of an automotive icon, famous for its minimalist design and on-road exploits.

Features

A 1/10 scale kit

  • Polycarbonate body reproducing the iconic lines of the Mini Cooper Racing.
  • Length: 315 mm , width: 167 mm, height: 140 mm for a compact and handy format.
  • Short 210 mm wheelbase , ideal for tackling bends with agility.

MB-01 Chassis: Ingenious Design

  • MB-01 chassis in front-engine/front-wheel drive (FF) configuration , respecting the philosophy of the original Mini.
  • Tamiya- branded robustness and reliability for long-lasting driving pleasure.
  • Possibility of customization and improvements thanks to specific Tamiya options (sold separately).

Performance and racing style

  • Eight-spoke rims combined with 60D radial tires , for a decidedly sporty look.
  • Type 540 motor and speed controller included, ensuring responsiveness and speed suitable for most circuits.
  • Reduced mass which promotes liveliness and maneuverability, perfect for RC racing fans.

Requires

  • Radio + receiver
  • 7.2v nimh battery + charger
  • Lexan paint
  • Steering servo

 

Specifications

Article number
58747
EAN Code
4950344587476
SKU
58747-600

Reviews

Any questions about this product?
Or do you need any help ordering? Feel free to get in touch with our support department at [email protected] or +61 8 9274 8333. We're happy to help! Please include Article nu

Related products

Any questions about this product?
Or do you need any help ordering? Feel free to get in touch with our support department at [email protected] or +61 8 9274 8333. We're happy to help! Please include Article nu

Recently viewed

INTEGY INTEGY WHEEL NUT (2) FOR AFA01
INTEGY
INTEGY WHEEL NUT (2) FOR AFA01
INTEGY WHEEL NUT (4) FOR AFA01
$14.15 $12.86
 
HY MODEL ACCESSORIES HY FOAM PROTECTOR VELCRO STRAP L350 X W70mm ( OLD CODE HY131402 )
HY MODEL ACCESSORIES
HY FOAM PROTECTOR VELCRO STRAP L350 X W70mm ( OLD CODE HY131402 )
HY FOAM PROTECTOR VELCRO STRAP
$7.92 $7.20
 

Specifications

Article number
58747
EAN Code
4950344587476
SKU
58747-600
0/5
0 stars based on 0 reviews
0 reviews
Choose your language
Choose your currency
$

Recently added

Total incl. tax
$0.00
0
Compare
Start comparison

Review TAMIYA TAMIYA MINI COOPER RACING (MB-01) Chassis 1/10 KIT NO ESC INCLUDED REQUIRES TX, RX, ESC, BATTERY CHARGER & PAINT

This product has been added to your cart
Please accept cookies to help us improve this website Is this OK? Yes No More on cookies »